Slide background
Slide background
Slide background

SEVEN-T (ROBG- 432)

Silistra – Ecofriendly – Viable – Electrical – Navodari Transport

What’s the goal?

To improve tertiary nodes connection by reconstruction of 4,315 m of road and introducing eco-friendly-transportation in the Silistra - Navodari cross-border area.

What’s the budget?

7.896.727,79 euro, out of which 6,712,218.61 euro ERDF

Who is doing it?

Lead Beneficiary (LB): Territorial Administrative Unit - Navodari Town (Romania)

Beneficiary 2 (B2): Silistra Municipality (Bulgaria)

When is it happening?

Start date: 24.04.2018

End date: 23.04.2023

Duration: 60 months

Where is it happening?

Constanta in Romania

Silistra in Bulgaria

How is it going to happen?

  • Elaboration of a Joint Strategy whose aim will be to identify better transport services for the citizens in the cross-border area, improve the accessibility and mobility of people with minimum effects on the environment and propose future projects to be developed in common;
  • Elaboration of a Joint Route Guide which will gather information about bicycle lanes and routes, sightseeing - cultural and natural heritage, hotels, shops and garages for bicycles in the region of Silistra and Navodari;
  • Construction of a 14.414 m of bike lanes, construction of 7 bike docks in Silistra (for standard and electric bikes), 36 bus and bike stations in Navodari and 1 solar parking in Silistra; 
  • Rehabilitation of 4.315 km of road;
  • Organization of communication and promotion activities.

What will be the results (what’s the contribution to the Programme)?

Programme outputs: 

4,315 km of rehabilitated roads;

2 joint mechanisms that facilitate the connection of secondary/tertiary nodes to TEN-T infrastructure;

Programme results: 

68,211 persons from the cross border area will be served by modernized infrastructure leading to TEN-T

Project status

The project is finalized.

LB – TAU Navodari Municipality realized the following investments:

Modernization of Navodari boulevard - 3.84 km of road were modernized, bicycle paths were built for a length of 6.90 km, traffic signs were installed and 36 modern bus stops were placed.

B2 – Silistra Municipality made the following investments:

8.64 km of bicycle paths were built/marked in the municipality of Silistra. 7 docks have been installed for electric and normal bikes. Vaptsarov boulevard with a total length of 0.47 km was modernized.

The partners carried out related activities to ensure publicity and information. Thus, a web page of the project was developed, available at the address https://ro.seven-t.ro/ . Also, several videos regarding the investments made within the project are available on the YouTube platform, at the following addresses: https://youtu.be/prRoMPYbmO8, https://youtu.be/3XKHrxoMsqc,https://youtu.be/6thV5sAeCcs,https://youtu.be/VBt9p8-RQHk, https://youtu.be/p4KuQ_syBi4 , https://youtu.be/7_T6dImmA18 , https://youtu.be/NoFvrZiXJt4, https://youtu.be/WKpGpYU-V-A, https://youtu.be/0k3mKjJHupw .

1 Common strategy for development of Eco transportation in Navodari-Silistra cross-border area was also developed and is accessible on the following link on the project web site:  https://ro.seven-t.ro/strategia-de-dezvoltare-a-transportului-prin-proiectul-silistra-ecofriendly-viable-electrical-navodari-transport/ .

A Joint Route Guide was elaborated, containing gathered information about bicycle lanes and routes, sightseeing - cultural and natural heritage, hotels, shops and garages for bicycles in the region of Silistra and Navodari, which was further promoted by the project beneficiaries. The Joint Route Guide is available on the following links - on the project web site: https://en.seven-t.ro/brochure/ and on the web site of the Silistra Municipality: https://silistra.egov.bg/wps/portal/municipality-silistra/home/tourist.info/tourist.info .

 

Pictures

December 2024
Mo Tu We Th Fr Sa Su
25 26 27 28 29 30 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

The content of this website does not necessarily represent the official position of the European Union. The initiators of the site are the sole responsible for the information provided through the site.